Project Client City of Regina
Project Cost $4,000,000
Lead Engineer Kurt Kinaschuk
Location Regina, SK
Building Size 3000 sq. ft.
Year Completed 2010

No. 4 firehall is constructed of a structural steel roof supported by loadbearing masonry block walls supported on concrete grade beams and drilled concrete piles.  The main floor for both the housing area and the apparatus bay is a structural slab on void isolating the slab from the expansive clay soils below.